Week 7 - From the Windows...to Drywall!

Hi All,

This week was another fast-paced construction week!  

Before the heavy-lifting began, I took an opportunity to write a few bible verses on some studs (Tuesday):


On Wednesday, the insulation was added and drywall was delivered:


And by Saturday the walls and ceiling were drywalled! It looks so much bigger and brighter since it's white.

Additionally, dirt was delivered so that the lot could be graded.

What's interesting is that I thought all of the connected units would be completed on the same schedule.  The other two units are still down to the studs.  Not my concern...just something I noticed.  Just glad things are moving along for us.  :-)

-Honey
39 days to go